Co-packers · Packaging buyer’s guide
A label handoff to a co-packer needs both the approved print file and the correct physical roll specification. Put those approvals in the same job record so an artwork change does not silently detach from the machine setup.

The short answer
Treat the printed version and the physical roll specification as one controlled handoff. The receiving team needs to identify the SKU, quantity, and current approval. Reconfirm the line setup when the label size, construction, or winding requirements change.
What to review before approving production
Ask the co-packer to confirm the roll requirements in writing and identify the person approving changes. Label cartons and rolls so the receiving team can match them to the scheduled SKU. This complements the roll-label specification guide by focusing on approval ownership and handoff.
Build a practical project brief
- Approved artwork revision and SKU
- Written roll and applicator requirements
- Receiving identification and quantity
- Owner for line-trial and change approval
Discuss your next run with Pacer
Send your existing packaging, current artwork or a product sample, and the quantities needed for each design. Include the delivery ZIP code and required date so the discussion reflects the job you actually need. Confirm the proposed materials, available features, minimums, production timing, and any testing with Pacer before ordering.
Related packaging information
Explore Pacer’s packaging services · Related buying information · All resources